Stormwater drainage and deterioration of Kezar and Lafleur streets
Residents of Kezar and Lafleur streets in North Hatley have been reporting stormwater management issues for several years, particularly due to ditches requiring maintenance and a road configuration that does not always allow for adequate water drainage.
During heavy rains, water runoff leads to overflows, damage to riverside properties, and a significant accumulation of sediment on the road surface.
This situation also contributes to the progressive deterioration of the asphalt, especially during freeze-thaw cycles, when water collects on the road.
In winter, drainage problems and the condition of the road surface also complicate traffic and access to certain essential services, including waste collection and home delivery of medication.
The issue also affects the bottom of Kezar street, at the intersection with Capelton road, where stormwater management requires coordination with the Ministère des Transports et de la Mobilité durable (MTMD). The proximity of Kezar creek also implies environmental considerations.
According to information communicated by the municipality's general management in April 2026, temporary interventions were carried out in 2025, including the installation of retention basins and the re-profiling of certain ditches. The municipality has committed to continuing maintenance in 2026.
However, a permanent solution would require more significant infrastructure repair and stormwater management work. These works, estimated at approximately $500,000 for both sections, are part of a funding request to the PRIMEAU program.
The main challenge is therefore twofold: ensuring adequate drainage quickly to protect properties and maintain the safety and accessibility of the streets, while planning a lasting repair of municipal infrastructure.
Issue timeline
- November 2, 2026
- November 2, 2026
Follow-up request and progress update by a citizen, November 2, 2026 meeting
A citizen highlights that water is seeping into the ground, a phenomenon he describes as "percolation." He also mentions that a neighbor has been met by the Municipality. The affected residents are currently trying to carry out work to facilitate water runoff, while preventing it from causing damage to neighboring properties and residences.
- September 8, 2026
Follow-up request and progress update by a citizen, September 8, 2026 meeting
Follow-up question on the file by a citizen.
- April 15, 2026
Request for clarification
Requests an estimated timeline for the PRIMEAU response and confirmation of municipal support for ditch maintenance, particularly to prevent overflows during heavy rainfall. - April 15, 2026
Confirmation of maintenance in 2026
Confirms that the public works team will carry out ditch maintenance in 2026. Indicates no specific date is available regarding the PRIMEAU response and assures that the municipality is performing the necessary follow-ups. - April 14, 2026
Detailed municipal response
Confirms a PRIMEAU application for a $2M to $3M project, including Kezar and Lafleur, as well as a $500,000 estimate for these two sections. Specifies the procedures with the TECQ, the MTMD, and the Ministry of the Environment, and the maintenance work planned for 2026. - April 13, 2026
Initial citizen request
Requests a maintenance schedule for ditches and asphalt repair. Describes damage to properties, sediment accumulation, drainage issues, and difficulties accessing services in winter. Inquires if any work or grants are planned.
Comments (0)
No comments yet. Be the first to react.
Contribute to this article
Do you have useful information?
A cost, a document, a photo or a correction. Every piece of information is verified before being added to the article or to an issue.