Here is the timeline of steps taken in relation to our permit application to install an awning in the backyard of 80 Main Street (former hair salon).
Timeline
July 10, 2025 — Application submitted for a permit for an awning at 80 Main Street.
August 2025 — At the inspector’s request, reduction in the width of the awning.
August 19, 2025 — The inspector confirms the presentation to the CCUP; the request receives a favorable opinion.
September 8, 2025 — Presentation to the City Council; the resolution of acceptance is recorded in the minutes (Ref. 2025-09-08.177) below.

Reference: Minutes of September 8, 2025. Approval by the CCUP and the municipal council.
October 17, 2025 — Email from the inspector informing us of the refusal of the awning permit.

Conclusion
Nous avons donc appliqué les ajustements exigés et lancé les commandes d’impression en conséquence. Malgré l’avis favorable du CCUP et la résolution d’acceptation du Conseil, le permis a finalement été refusé.
Cette séquence soulève des questions de cohérence administrative.